Minsk 5 Project
日期:2015-05-01 发布人: 】【打印 关闭
Minsk No.5 Thermal Power Plant Rehabilitation Project in Belarus (abbreviated as Minsk 5 Project).
 
Minsk No.5 Thermal Power Plant Rehabilitation Project in Belarus is the largest ever project being implemented between China and Belarus for the time being. The contract was concluded in September, 2008, and the construction was expected to be completed in 2011 for generating electricity. The project is funded by China’s export buyer’s credit, for building a gas-steam combine cycle unit, with a total capacity no less than 400MW±10%. CCOEC is the EPC contractor, and most of the equipments for the projects are manufactured in China, which is the first in exporting China-made heavy gas turbines.
 

上一条:Emergency Humanitarian Assistance Project of Vanuatu

下一条:Minsk 2 Project

版权声明

本网站的资料、信息、版面设计、图案、流程、声音、程序及其他内容的所有权、著作权及其他权利由中国海外经济合作有限公司享有并予以保留。

相关导航
内网入口邮箱入口
联系我们

公司地址:北京市朝阳区劲松九区910号

电    话:010-68027842

传    真:010-68036042

版权所有 中国海外经济合作有限公司 Copyright2011 CCOEC. All Rights Reserved     京ICP备12025793号-1   京公安备案110401300015

技术支持:北京信诺诚科技发展有限公司